Green Energy Hub: EV Charger and Café

INR 1500–12500

OpenListed onFreelancer.com
Fixed

About the project

EV Charging Station + Cafe — Architectural Design Brief Site Overview • Quadrilateral plot bounded by Pt5–Pt4–Pt3–Pt6, fronting two separate 9m-wide roads (one along Pt14 side, one along Pt9-Pt10-Pt11 side) — a through/double-frontage plot • Approximate side lengths: Pt5–Pt4: 12.0m | Pt4–Pt3: 13.7m | Pt3–Pt6: 12.5m | Pt6–Pt5: 9.7m • Additional internal/diagonal reference distances noted on survey: 16.1m and 17.5m — freelancer to confirm exact plot geometry against the stakeout survey/coordinates before finalizing layout • Double road frontage is a design advantage: separate entry/exit for vehicles, or one road for charging bay access and the other for cafe customer parking/walk-in Project Brief Design a two-purpose facility: EV charging station (ground floor) + cafe (can be ground or first floor, freelancer to advise based on plot shape and visibility). Functional Program EV Charging Zone • Charging bays for DC fast chargers (2x180kW or 2x80kW depending on final station spec — confirm with client) • Clear vehicle circulation: entry, charging bay approach, exit — using the double road frontage for one-way flow if possible • Driver waiting/lounge area (can overlap with cafe seating) • Electrical room/transformer + DU (distribution unit) area — needs to be close to charger positions, adequately ventilated • Restroom (customer-facing) Cafe • Seating area (indoor + optional outdoor/covered seating facing road) • Kitchen/prep area • Counter/billing area • Could be positioned on first floor (G+1) for road visibility and to free up ground floor for charging bay maneuvering — freelancer to propose best massing Sustainability • Rooftop solar provision (target ~20kW, confirm with client) — structural allowance needed on roof/first floor slab • Rainwater harvesting provision (recommended for KA compliance) Site Constraints & Considerations • Confirm setback requirements per local municipal/BESCOM norms for corner/through plots • Vehicle turning radius for cars/small trucks accessing DC fast chargers — plan bay width and approach accordingly • HT electrical connection and transformer placement — coordinate with electrical contractor (500kVA sanctioned load if applicable) • Signage/visibility from both road frontages Deliverables Requested from Freelancer • Concept site plan showing charging bay layout, cafe zone, circulation, parking • Floor plans (ground floor + first floor if G+1) • Elevations (at least front views from both road frontages) • 3D render/visualization (optional but preferred for client presentation) • Structural provision notes for rooftop solar • Estimated built-up area and cost-per-sqft ballpark Notes for Freelancer • Client to confirm final charger count/capacity before layout is locked • Plot dimensions to be verified on-site against the stakeout survey before design finalization • Design should allow phased construction if needed (Phase 1: charging infra + basic structure; Phase 2: cafe fit-out)

Skills required

This job is listed on Freelancer.com. AiZity aggregates listings for discovery only and is not the employer. To bid or apply, use the button in the sidebar.

Similar jobs

Other open projects with overlapping skills and budget type.

More CAD/CAM jobs →